The Brief
- SRP is draining a 2- to 3-mile section of a Chandler canal to perform routine maintenance and fix leaks.
- Crews Saturday worked to relocate white amur fish, which naturally control vegetation in the canal system.
- The maintenance work from about Pecos Road south to Chandler Heights will continue until roughly Dec. 24.
CHANDLER, Ariz. – Salt River Project crews are draining a section of the Consolidated Canal in Chandler to remove debris, clear built-up silt and make repairs designed to prevent water loss.
The work is part of SRP’s routine canal maintenance program. The utility said they rotate canal dry-ups on a four-year schedule to maintain its 131-mile canal system, which delivers water to more than 2.5 million Valley residents…