ConnectCR and the city of Cedar Rapids are both working on new projects to revamp the Mount Trashmore area.
Although the projects have very similar names, they have key differences between them.
The Alliant Energy LightLine bridge project is run by ConnectCR, whereas, the Lightline Loop is run by the city of Cedar Rapids.
The bridge is replacing the washed out railroad bridge that way destroyed in the 2008 flood. It will provide visitors with a safe way to cross the Cedar River, while also connecting Newbo and Czech Village district.
The Lightline Loop will be a multipurpose space for residents and visitors. The space will include the Roundhouse, which was also destroyed in the 2008 flood, along with pedestrian paths, additional parking, and space for events of all sizes…