DAVIDSON COUNTY I-24
Digital message sign repair.
- 6/26, 8 p.m. – 5 a.m., There will be a single lane closure on I-24 eastbound for DMS repair (MM 52.8 – 54.0).
LED streetlight conversion.
- 6/26 & 6/30 – 7/2, 8 p.m. – 5 a.m., There will be a stationary left lane closure for LED streetlight conversion from Old Glenrose Avenue to Haywood Lane (MM 49.5 – 53.5).
- 6/26 & 6/30 – 7/2, 8 p.m. – 5 a.m., There will be a stationary left lane closure for LED streetlight conversion on I-24 from Bell Road to Old Franklin Road (MM 56.1 – 57.3).
Resurfacing.
- 6/29 – 7/2, 8 p.m. – 5 am., There will be alternating lane closures on I-24 near I-440 to near Haywood Lane in both directions for texture coating (MM 53 – 57).
DAVIDSON AND RUTHERFORD COUNTIES I-24
Survey and utility work.
- Daily (excluding weekends), 9 a.m. – 3 p.m., There may be intermittent shoulder closures on I-24 in both directions for survey and utility work (MM 53 – 67). Traffic control will be in place.
- Nightly (excluding weekends), 8 p.m. – 5 a.m., There may be intermittent outside lane closures on I-24 in both directions for survey and utility work (MM 53 – 67). Traffic control will be in place.
MONTGOMERY COUNTY I-24…