Georgia Power leaders joined elected officials from the Georgia Public Service Commission (PSC), Georgia legislature, and Talbot and Muscogee counties on Thursday to mark commercial operation of the company’s first “grid-connected” battery energy storage system (BESS). The Mossy Branch Battery Facility is capable of 65 megawatts (MW) of battery storage that can be deployed back to the grid over a four-hour period, adding resiliency to the state’s power grid and helping ensure reliable energy for a growing Georgia. The Mossy Branch facility was approved by the Georgia Public Service Commission as part of Georgia Power’s 2019 Integrated Resource Plan (IRP) and is…