CCL Stage 3 consists of seven midscale trains, with an expected total production capacity of over 10 million metric tons per annum (mtpa) of LNG. Cheniere Energy, Inc. has produced the first liquefied natural gas (LNG) at the first train of the company’s Corpus Christi Stage 3 Liquefaction Project (CCL Stage 3).