TDOT Work at 8 Area Locations

Contractor resurfacing on I‑24 in both directions from MM 152.2 to MM 156. Work occurs Sunday nights through Thursday nights from 7 PM – 6 AM. Single lane closures will leave one lane open. Intermittent full ramp closures will leave at least one ramp open in each direction. Tennessee Highway Patrol will assist.

MARION COUNTY SR-108 [2.8-3.24] slide mitigation:

Contractor performing slide mitigation including grading, drainage, and paving on SR‑108 at LM 2.8. Road reduced to one lane controlled by temporary signals. Project completion date: 08/31/2027. Use caution…

Story continues

TRENDING NOW

LATEST LOCAL NEWS