Tarpon Springs Flood Fix Could Shut Sponge Docks Streets for 18 Months

A long-awaited flood-control project at Tarpon Springs’ sponge docks is nearing final design, but the construction timeline attached to it has business owners along Dodecanese Boulevard and Athens Street bracing for what some fear could be a fatal blow. Proposed construction could close portions of both streets for 18 months or more, and the project still has no exact start date.

A Project Years in the Making Nears a Vote

Tarpon Springs has worked for years to address chronic flooding at the sponge docks, and as reported by Spectrum News, the city is now close to finalizing plans for a stormwater improvement project intended to reduce that flooding. The design phase is nearly complete, and the Tarpon Springs City Commission is expected to conduct a final project review in late January, with the project potentially finalized in February 2027. The city’s project page for the effort describes installing a new stormwater collection system of pipes along Athens Street from Cross Street to Dodecanese Boulevard, and along Dodecanese Boulevard from just west of Athens Street to just west of Arfaras Street, according to the City of Tarpon Springs.

Plans also call for a new stormwater pump station near the Dodecanese/Athens intersection. The city says the new system and pump station are intended to reduce what it calls historic and frequent flooding at the Dodecanese/Athens intersection and along Athens Street from Dodecanese Boulevard to just north of Cross Street. New flow pipes included in the project could reduce flooding caused by high tides and heavy storms, though the pipes would provide no protection against hurricanes.

Flooding That Residents Say Happens Monthly

The flooding problem long predates this latest proposal. Tampa Bay 28 reported in 2021 that business owner Julie Russell said some roads flood maybe several times a month, separate from hurricanes or unusually severe tides. More recently, the Tampa Bay Times described visitors to the sponge docks navigating floodwater on Dodecanese Boulevard during Tropical Storm Debby in 2024. The city’s own project page notes that Dodecanese Boulevard between Athens Street and Arfaras Street has historically flooded during nominal storm events, with significant storms or those coinciding with high tide sometimes reaching private property.

Business Owners Fear Two Lost Seasons

For George Billiris, who runs St. Nicholas Boat Lines, the math is alarming. Construction would take place directly in front of his tour boat operation, and he said the work could cut businesses out of two full seasons — a stretch he believes they cannot sustain. Billiris also questioned the project’s real benefit, noting it does nothing for his operation during hurricane storm surge.

Athena Tsardoulias, who runs Tarpon Sponge Incorporated and whose family has been involved in the sponge business for more than 100 years, described the sponge docks as Tarpon Springs’ economic hub, one she says affects everyone in town. She said many businesses are still recovering from recent hurricanes and costly repairs, spending fortunes rehabbing buildings, and are not back to where they used to be or should be. Tsardoulias said she and many other business owners could go out of business if the project moves forward as proposed, and she hopes it can be scaled back. She believes owners’ concerns should be heard before the project advances further.

A Commissioner Caught Between Flooding and Closures

City Commissioner Michael Eisner said he is concerned about the estimated 18-month construction timeline and the toll street closures could take on local businesses. He said he had received no positive comments from business people in favor of the project. Eisner said he believes quicker water recession may be possible, but he opposes forcing a two-year downturn on businesses without some kind of backup plan…

Story continues

TRENDING NOW

LATEST LOCAL NEWS