While traffic is on the rise on the Foley Beach Express, work on the highway is moving ahead of schedule. Improvements to widen the Beach Express began earlier this summer. In May, the Alabama Department of Transportation purchased the bridge over the Intracoastal Waterway at the southern end of the expressway. The state removed the tolls that had been in place since the bridge opened in 2000.