A major maintenance paving project on Highway 9 began Aug. 19, taking place between Lazy Woods Road in Felton and California Drive in Ben Lomond. This 2.7-mile paving project will grind off the top layer of existing asphalt pavement and overlay the roadway with the same respective thicknesses using rubberized hot mix asphalt.