CHARLESTON, S.C. (WCSC) – A flood-prone road lining the Charleston Harbor will soon see the addition of a small seawall. Charleston City Council will use $260,000 to build a knee-high flood mitigation wall and sidewalk on Lockwood Drive. The two-lane road, used by peninsula commuters behind the wheel and on-foot, is often met with a high risk of flooding.