MIDDLE TENNESSEE SCHEDULED LANE CLOSURES
December 19 – January 1, 2024
DAVIDSON COUNTY I-24
The resurfacing on I-24 near I-440 to near Haywood Lane.
- Nightly, 8 p.m. – 5 a.m. (excluding holiday restrictions), There will be alternating lane and ramp closures on I-24 in both directions for pavement markings.
RUTHERFORD COUNTY I-24
Survey operations (MM 71 – 75.5).
- Nightly, 8 p.m. – 5 a.m. (excluding holiday restrictions), There will be inside lane closures on I-24 in both directions for survey, drain cleaning, and drainage structure inspection work.
The resurfacing on I-24 from near the Stones River to east of the CSXT Railroad (MM 78 – 82).
- Nightly, 8 p.m. – 5 a.m. (excluding holiday restrictions), There will be alternating lane closures in both directions for paving activities.
The improvement of off-ramp on I-24 and US-231.
- Nightly, 8 p.m. – 5 a.m. (excluding holiday restrictions), There will be alternating lane closures on I-24 WB to move barrier wall.
Road repair.
- 12/19, 8 p.m. – 5 a.m., There will be lane closures on I-24 WB and Lane 4 of the Sam Ridley on-ramp for repairs.