MOBILE, Ala. (WALA) – The City of Orange Beach has posted on its Facebook page that work on the new AL 180 Connector fixed bridge will require daytime closure of Intracoastal Waterway August 11-15.
Here is the post:
Please plan accordingly…Bridge work will require daytime closure of Intracoastal Waterway, August 11-15…