Progress at Potomac sewer collapse, DC Water says, but overflow risk remains

D.C. Water is touting new pumping capacity and a third active flume as signs of progress at the site of the massive Potomac sewer pipe break, even as the utility warns the threat of another overflow won’t subside until a rock dam inside the damaged pipe is removed.

The water agency said Sunday that crews increased pumping power and activated a third wastewater flume while preparing a steel bulkhead that would let crews reach and remove the rock obstruction inside the broken Potomac Interceptor.

All four new high‑capacity bypass pumps recently installed are now fully primed and operational, which D.C. Water said boosts overall flow capacity and reliability as crews manage higher volumes tied to rainfall and melting snow and ice…

Story continues

TRENDING NOW

LATEST LOCAL NEWS