The city of Greenville has refined its plans for connecting the North Main neighborhood to the Prisma Health Swamp Rabbit Trail Orange Line extension.
The Orange Line currently branches off from the Swamp Rabbit Trail Green Line at West Washington Street and continues to Buncombe Road. Greenville County plans to add another 1.5 miles to the trail using an inactive train corridor to connect to Worley Road, near Other Lands.
A feasibility study was conducted in 2025 to examine the potential of extending the Orange Line through the North Main neighborhood to the intersection at Wade Hampton Boulevard and North Church Street…