Grand opening Saturday for Phase 2 of Signal Butte Park in Mesa

The public is invited to a ribbon-cutting ceremony for Phase 2 of Signal Butte Park, 3355 S. Signal Butte Road, at 10 a.m. Saturday, Nov. 7.

The new park includes 1.5 miles of new LED-lighted walking trails along with three ramadas, biking flow trails, a tot track and a BMX asphalt pump track designed by Pillar Design Studios…

Story continues

TRENDING NOW

LATEST LOCAL NEWS