The public is invited to a ribbon-cutting ceremony for Phase 2 of Signal Butte Park, 3355 S. Signal Butte Road, at 10 a.m. Saturday, Nov. 7.
The new park includes 1.5 miles of new LED-lighted walking trails along with three ramadas, biking flow trails, a tot track and a BMX asphalt pump track designed by Pillar Design Studios…