Peoria residents, brace yourselves for ongoing developments as the 67th Avenue Corridor Improvement Project marches on, with the stretch from Pinnacle Peak Road to Happy Valley Road in the midst of significant widening and drainage enhancements. As reported by the City of Peoria, utility crews from APS and Southwest Gas are currently relocating their infrastructure, a job expected to run through the end of June, as they clear the path for upcoming civic improvements.
Amidst the shuffle, Peoria motorists should note, the Hatfield Road and 72nd Avenue intersection is set to be shut down from May 12 to 30 for the installation of a storm drain pipe, and despite the inconvenience, detour signs will shepherd travelers around the construction; paving is on the calendar…..