The US Army Corps of Engineers has opened up nearly all of the Table Rock Dam spillway gates on Saturday.
The agency says crews opened gates 1 through 9 to 1 foot each at 3 p.m. Saturday afternoon.
The spillway gates are being used because two of the four hydropower units are offline for scheduled maintenance,” the Little Rock District of the US Army Corps of Engineers posted on Facebook, along with the video above…