Cone Zone: 215 beltway widening, Green Valley Parkway revamp reach halfway point

LAS VEGAS (FOX5) — Henderson drivers are beginning to see major changes take shape along the 215 Beltway and Green Valley Parkway as crews reach the halfway mark on a massive road widening project.

The broader project aims to widen a 3-mile stretch of the 215 Beltway between St. Rose Parkway and Stephanie Street, adding two travel lanes in each direction along with new LED lighting, signage, and fresh pavement. Work began in May 2025, but the freeway expansion is only part of the transformation planned for the busy corridor.

At Green Valley Parkway, the City of Henderson is constructing a new pedestrian bridge at Village Walk Drive designed to ease vehicle congestion and improve pedestrian safety…

Story continues

TRENDING NOW

LATEST LOCAL NEWS