I-10 at U.S. 29 Interchange to face construction in Escambia County

Video above: ‘News 5 Now’ — Top Stories from Jan. 19, 2026

ESCAMBIA COUNTY, Fla. (WKRG) — I-10 at the U.S. 29 Interchange at Exit 10 will face construction-related traffic disruptions the week of Sunday, Jan. 18.

Lane closures are planned to occur on North Palafox Street between Whitehead Drive and Hope Drive for construction at the overpass of North Palafox Street.

Milton woman charged with animal cruelty

Due to the construction, I-10 will be reduced to two travel lanes in each direction between U.S. 29 and I-110. Travel lanes on I-10 will be shifted away from the median area of the roadway, which is near the U.S. 29 interchange…

Story continues

TRENDING NOW

LATEST LOCAL NEWS