RENO, Nev. (News 4 & Fox 11) — A critical flood mitigation project anticipated to minimize the damage from a major flood event in the Reno-Sparks area has moved into the final design phase, with construction expected to begin in 2027 or 2028.
The Truckee River Flood Management Authority (TRFMA) announced this week that the Vista Narrows project, which has been envisioned since the 1980s, is one step closer to breaking ground.
$50M project to reduce Truckee River flood risk advances to final design phase…