BREWERTON, N.Y. (WSYR-TV) — The busy Route 11 bridge in Brewerton was supposed to open by the end of the year, but the DOT said the project has fallen behind…
BREWERTON, N.Y. (WSYR-TV) — The busy Route 11 bridge in Brewerton was supposed to open by the end of the year, but the DOT said the project has fallen behind…