Modular steel solution restores vital link in a 24-mile trail closed for nearly two years
(Parsippany, New Jersey) – Acrow, a leading international bridge engineering and supply company, is pleased to announce it has supplied a modular steel bridge to restore full-route access of the Foothills National Recreation Trail Southeast of Tacoma, Washington. The popular trail is used by commuters as well as recreational walkers, cyclists, skaters and equestrians.
The old timber Spiketon Ditch Bridge that Acrow’s structure replaced was closed in November 2023 after an inspection found severe structural deficiencies. The closure interrupted continuous access of the 24-mile trail, and a stronger, more durable, longer-lasting solution was sought. At the same time, the relatively remote location, site constraints and environmental permitting requirements limited the construction methods available. Design engineer AHBL was brought in, and ultimately, a modular steel bridge from Acrow was selected as the best option for the project…