BOILING SPRING LAKES, NC (WWAY) — In a Facebook post, City Manager, Gordon Hargrove announced that the work at the Pine Lake Dam site would need to be stopped according to the Engineering Consultant.
The post went on to say that during the rainfall on June 14th, the Pine Lake water levels did not appear to be correct.
The city contacted the contractor, design engineers and the consulting engineers…