FORT MYERS, Fla. —
A temporary steel plate installed on the northbound side of the Edison Bridge in Fort Myers has caused tire damage and raised safety concerns, according to drivers and a local mechanic.
Mike Whatley, a mechanic at Rednek Mechaniks, said he was alarmed after driving over the plate, which was installed as part of an emergency repair to address a damaged bridge joint from 2022…