WattEV has opened its seventh heavy-duty electric truck charging depot in California, adding a charging location in Fresno that connects freight routes between the ports of Oakland and Stockton and inland hubs in the northern San Joaquin Valley.
The Fresno depot is the first of four planned sites for electric truck freight transport in Northern California.
Located along Highway 99, the site includes seven MCS megawatt chargers designed to support charging sessions of 30 minutes or less and 15 single-cord 240 kW CCS chargers for heavy-duty EVs…