MADISON, Ala. — For some Madison residents, the Bradford Creek Greenway is part of the routine — a place to go for a run, take a walk with the kids, ride a bike or simply get some fresh air.
But that routine could soon be interrupted for about seven months.
Madison Utilities plans to replace an existing 20-inch gravity sewer main with a 30-inch line as part of its Western Interceptor project. The larger line is designed to provide more capacity for current and future wastewater needs…