WRIGHTSVILLE BEACH, N.C. (WECT) -The Town of Wrightsville Beach has announced that a paving project will begin this week.
Crews will begin curb and gutter repairs will take place this week, and the milling/paving work will take place May 4-6 along S. Lumina Ave. & N. Channel Dr.
Residents with artificial turf adjacent to the street must pull it back at least 2 feet from the asphalt edge before paving to prevent damage. Turf can be replaced a few hours after paving, once the asphalt has cooled…