Bridgeview is resurfacing nearly half a mile of streets and modernizing its stormwater system through a multimillion-dollar infrastructure push designed to be completed by year’s end.
The Street Paving and Infrastructure Program targets structural deterioration before winter, aiming to reduce long-term maintenance costs and boost property values. The work includes full-depth asphalt resurfacing, ADA-compliant pedestrian ramps, and upgraded storm drainage systems.
“By addressing road deterioration now, we’re preventing far costlier repairs down the road,” Mayor Steve Landek said…